Day149-3Wow, what a week Our Nolan has had. In addition to the stairs going in, we now have the final layer of render which  includes the colour, a roof on the garage and wait for it…. the kitchen!!! While the kitchen is not quite finished yet, the main cabinets and the island bench were installed today and it looks great. It’s always hard to know if what you choose from the tiny sample pieces will work together so to see everything coming together looking they way we wanted it to is a relief and and real thrill too.

Other items completed included water proofing to the wet areas and phone line connection from the house to the the Telstra pit on the nature strip. Once the weatherboard cladding at the rear is installed (next week) we should be getting close to lock-up completion.

View from the street

View from the street

Render is now complete.

Render is now complete.

Front door

Front door

Sitting room

Sitting room

Garage colorbond roof is now on.

Garage colorbond roof is now on.

From inside the garage you can see the truss and sarking.

From inside the garage you can see the truss and sarking.

View if the garage from the rear.

View if the garage from the rear.

Very exciting to see the kitchen go in.

Very excited to see the kitchen go in.

C&K

Advertisements

Actions

Information

7 responses

6 04 2013
Mandy

Hi
I really enjoy reading your blog and your house looks fantastic. We are building the Nolan 50 and can’t wait for it to start, we are waiting for developers approval at the moment.
Look forward to your next post
Mandy

6 04 2013
ournolanhome

Hi Mandy,

Congratulations on your choice of the Nolan. Hope your approval doesn’t take too long.

Chris & Kristen

9 08 2013
Don

Hi Chris and Kristen
I’ve been following your building blogs and found it to be very informative. I admire and appreciate your dedication in providing an insight and sharing your building experience. Your home looks awesome. I’m currently building with Metricon (Nolan 41) as well. I noticed that you guys had your stairs stained before hand over. Was that part of your contract or was it arranged with someone else external to Metricon? If it was external how much did it cost to get it done? My stairs is pretty the same as yours. I was told that I can only get it stained after handover.

thanks,
Don

9 08 2013
ournolanhome

Hi Don,

We did get Metricon to do the staining of the stairs. I later found out that this is something they don’t normally do and that we were ‘lucky’ to get this included.

Not sure why this isn’t something they do as standard.

C&K

19 05 2017
Clarissa

Hi 🙂 I absolutely love your render, what is it?

20 05 2017
ournolanhome

Hi Clarissa, thanks! we love it too. The two colours are:
Teahouse (the darker one) and Linseed (lighter colour). Both are Dulux colours.

20 05 2017
Clarissa

Hey, I really love your render colour, what is it? Your house is beautiful 🙂

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s




%d bloggers like this: