Day 261: Final (Pre-Handover) Inspection

26 07 2013

home-final-inspectionWe originally had booked in for the final pre-handover inspection on Wednesday, but Metricon had to move it to today (Friday) as they wanted to get more painting fixes done before presenting to us.

It was busy at the house when we arrived with Simon, our Site Manager going over things with one of Metricon’s QA guys (Mick).  Theo from New Home Inspections (who was doing our independent inspection) was also there, and a few tradies doing maintenance works such as putting locks on doors.

Its been a few weeks since we have been inside the house and it was very exciting to see that we are so close to finishing. Having an independent inspector was good as he would pick up any structural or building regulation issues which we would not know about.  Theo did pick up a few items, one of the major ones was the surface finish and cracks in the garage which will need to be topped up with more cement concrete.

box_red_dots

Armed with a box of red dots, we went through the house with Simon inspecting the finishes.  Anywhere we found a fault (eg paint blemish, cracks, holes, damage etc) we put a red dot so they can be fixed prior to PCI (Practical Completion Inspection). Metricon will have a combined list of defects from their QA person, New Home Inspections Report and our list of defects to fix next week.

It was good to see Simon pick up a few issues as well as it shows he wants us to have a quality house.  Some of the defects we found included:

  • Scratches in floorboard (hopefully these can be fixed up well).
  • Damaged fly wire screens.
  • Front door lock mechanism needed adjusting.
  • Light switch not working
  • Power switch plate had a white plate when it should have been a metal/chrome plate.
  • Scratch in powder room mirror.

Early next week will also see the final electrical items go in, including all the kitchen appliances, hot water system, outdoor fan and ducted vacuum.

Here’s a few photos we took today:

Our pretty house!!

Our pretty house!!

Pillar lights

Pillar lights

Pillar Lights from another angle

Pillar Lights from another angle

Today was the first time we saw the stain on the stairs which has definitely finished off the stairs quite well.

Stained stairs

Stained stairs

Close up of stairs

Close up of stairs

View of the stairs from above

View of the stairs from above

View of stairs from leisure room.

View of stairs from leisure room.

Bi-fold doors complete with door handle

Bi-fold doors complete with door handle

Close up of door handle on bi-fold

Close up of door handle on bi-fold

Laundry splash back

Laundry splash back

Laundry splash back

Laundry splash back

Lock and handle on sliding door to powder room

Lock and handle on sliding door to powder room

Study 'feature' door now complete with handle

Study ‘feature’ door now complete with handle

Balcony

Balcony complete with wire balustrades

Some of the dots throughout the house indicating some maintenance need

Some of the dots throughout the house indicating a defect

Aircon unit

Aircon unit

Speaking with Simon, we are his last house in the Northern Suburbs.  Due to some changes at Metricon he is now working out in the East (around the Wantirna area).  Whoever has him now will be in good hands.

We also got the final invoice from Metricon’s office today.

We need to start packing soon….